white background
brownbk
blue background
CONTACT US
Fairfield  Department
of Health
1550 Sheridan Drive
Suite 100 (map)
Lancaster, Ohio 43130
P: 740-652-2800
EMPLOYMENT OPPORTUNITY

RESOURCES

Bed Bugs/Fact Sheet
Food Protection
Indoor Air Quality
Lot Splits
Mercury
Mosquitoes
Plumbing
Pools/Healthy Swimming
Rabies
Septic System Health
  
Flooded Well
  
Sewage Back-up
Sewage Systems
Solid & Infectious Waste
Tattoo Facilities
Ticks
Water Wells

FAQ
File Nuisance Complaint
Food Safety Recalls
Open Burning
Power Outage
   • Food Safety Tips
   • Water Safety Tips

QUICK LINKS

Hours & Directions
2016 Annual Report
Board of Health
Contact Us
Forms
Resources
PHAB Accreditation
Spring Newsletter
FAIRFIELD DEPARTMENT OF HEALTH: SUBDIVISION LAND + LOT INSPECTIONS
LOT INSPECTIONS
The Fairfield Department of Health will perform on-site evaluations of existing deeded lots to determine whether the lot can be developed for commercial or residential use. An Order One Soil Survey is required for the lot, but there is not a minimum acreage requirement for an existing lot to be evaluated. If you are interested in a lot that is less than 2.0 acres, you should contact the Fairfield Department of Health to ensure that the lot can be properly developed.

SUBDIVISION OF LAND
Fairfield Department of Health (FDH) approval is required for all new lots, including the remainder, regardless of size. Applying for a subdivision of land from FDH should be your first step for anyone interested in splitting land or creating a new lot. The subdivision of land should be applied for and approved by FDH before the proposed lot split is surveyed. The Fairfield Department of Health may require proposed lot lines to be adjusted based on the Order One Soil Survey.

Any proposed new lot must contain a usable area that contains soils suitable for the installation of a sewage treatment system. Usable acreage means a contiguous area of land which is not divided or limited by a waterway, easement, right-of-way, or other site or soil limitation affecting the installation of an on-site sewage treatment system.

The Fairfield Department of Health uses information from the Order One Soil Survey to determine the location of sewage treatment systems for each proposed lot. Subsequently, the location of proposed lot lines must accommodate these locations to ensure that the proposed lot can be developed in compliance with Fairfield Department of Health sewage treatment system regulations.

If a proposed lot is intended to have a use other than being developed for commercial or residential use (i.e. agricultural use or recreational use), only an application is required. A signed written statement clearly outlining the proposed use of the lot must accompany the application.

SUBDIVISION OF LAND PROCEDURE
1. A Order One Soil Evaluation must be performed by a soil professional for each proposed lot.
2. An application must be submitted along with the soil report to the Fairfield Department of
    Health Environmental Office. The fee for a lot split is $130.00 per lot.
3. Vegetation on the lot(s) must be mowed/cut to ankle level. Lots with high grass, brush, or crops cannot
     be adequately inspected. For wooded lots, only underbrush must be removed.
4.  In addition to FDH approval of the proposed split, approval must be obtained by both the
      Fairfield County Regional Planning Office and the Engineer’s Office
     A “blue sheet” will need to be signed by all three agencies.

Note: If the remainder is currently and will continue to be used only for agricultural purposes, it does not need to be inspected and the fee does not apply to the remainder. The fee also does not apply to a remainder parcel that includes an existing residence, but soil analysis is still required for a replacement sewage treatment system.

CURRENT SUBDIVISION OF LAND + LOT INSPECTION FEES
PERMIT
Subdivision of Land Application for on-site evaluation of proposed new lots
FEE:
$130.00 per lot
Lot Inspection Application for on-site evaluation of existing deeded lots
FEE:
$110.00 per lot
Subdivision of Land and Lot Inspection from Fairfield County Health Department